Investigations
HYDRAULIC PUMP SHAFT FAILURES
NHTSA Preliminary Evaluation PE04004 - closed, opened 2004-01-08.
NHTSA investigation PE04004 is a Preliminary Evaluation opened on 2004-01-08 and currently closed. The subject is tracked inside the Office of Defects Investigation queue. Latest activity on this investigation was logged on 2004-04-30 - NHTSA updates that field whenever an Information Request goes out, a supplement is filed, or a status change is recorded in the public docket.
A Preliminary Evaluation like PE04004 is the entry point of the federal defect-investigation process. NHTSA engineers scan complaint databases, field reports, and manufacturer data to decide whether an Engineering Analysis is warranted, whether a voluntary recall is already sufficient, or whether the pattern does not rise to a defect finding.
Investigators summarized the matter as follows: "THE PRELIMINARY EVAULATION IS BEING UPGRADED. DURING THE EA ODI WILL LIMIT ITS INVESTIGATION TO ONLY THOSE VEHICLES EQUIPPED WITH A HYDRO-BOOST SYSTEM, WHICH PROVIDES POWER ASSIST TO THE BRAKING AND STEERING SYTEMS. VACC..." Investigations are the early-warning layer of the federal auto-safety system, sitting upstream of formal recalls and defect orders. Whether this one closes without action or escalates into an Engineering Analysis, the full history stays in the ODI archive so researchers, litigators, and buyers can pull the paper trail at any time.
Investigation Summary
THE PRELIMINARY EVAULATION IS BEING UPGRADED. DURING THE EA ODI WILL LIMIT ITS INVESTIGATION TO ONLY THOSE VEHICLES EQUIPPED WITH A HYDRO-BOOST SYSTEM, WHICH PROVIDES POWER ASSIST TO THE BRAKING AND STEERING SYTEMS. VACCUUM BRAKE BOOSTER VEHICLES ARE EXCLUDED. ODI HAS EXPANDED THE SCOPE OF THE EA TO INCLUDE MODEL YEARS 2003 AND 2004, AS DURING THE PE, ODI LEARNED THAT THE HYDROBOAST PUMPS WERE MODIFIED IN FEBRAURY 2004. THEREFORE, ODI HAS EXPANDED THE SCOPE TO INCLUDE THE ADDITIONAL MODEL YEARS. ODI'S IS CONCERNED BECAUSE THIS IS A SUDDEN FAILURE THAT AFFECTS TWO CRITICAL SYSTEMS OF THE VEHICLE, BRAKES AND STEERING, AT THE SAME TIME. THE ABILITY OF THE OPERATOR TO HANDLE THE DUAL FAILURES IS A CONCERN. FURTHER, THESE VEHICLES TEND TO BE WORK VEHICLES, WITH SOME OVER 10,000 POUNDS GVWR AND MANY EQUIPPED TO PULL LARGE TRAILERS. DUAL FAILURES OF HEAVILY LOADED VEHICLES AND VEHICLES PULLING TRAILERS FURTHER INCREASES THE SAFETY RISK. ODI PLANS TO CONDUCT TESTING TO QUANTIFY THE BRAKING AND STEERING PERFORMANCE DEGRADATION AND THE IMPACT ON SAFE VEHICLE CONTROL, WHEN A HYDROBOAST PUMP FAILS.
About This Investigation Type
A Preliminary Evaluation (PE) is the first phase of NHTSA's investigation process. It is opened when the agency identifies a potential safety defect pattern, usually triggered by consumer complaints, manufacturer reports, or field monitoring. During a PE, NHTSA gathers information to determine whether a formal engineering analysis is warranted.
Data from NHTSA Office of Defects Investigation. Cross-references: NHTSA recall campaign API and NHTSA FARS where fatality records overlap. PlainCars does not rate or recommend vehicles. about how PlainCars sources NHTSA data.